大丰开展党徽耀红盾

大工商〔2011〕15号。

关于在全系统开展党徽耀红盾”系列活动争创群众满意窗口服务单位”的实施方案。

为推动创先争优活动深入开展,,,根据关于在全工商系统开展党徽耀红盾”系列活动争创群众满意窗口服务单位”的实施方案,特制定本方案。

一、指导思想。

十七届四中五中全会,以党徽耀红盾塑造工商部门良好的行业形象。

二、三、步骤启动部署阶段(。统一部署,深入开展调查研究,制订组织实施。通过向社会公开服务承诺,接受群众评议监督。公开岗位职责规范、党员形象标识,坚持挂牌上岗,亮出党员身份。集中推进阶段对照方案先进经验总结阶段通过座谈、走访和问卷调查等形式,征求服务对象的意见和建议,并有针对性地提出改进工作的措施。总结活动,构建长效机制。、工作要求。

各分局、各要充分认识开展党徽耀红盾”系列活动争创群众满意窗口服务单位”的重要意义,将其作为创先争优的重要抓手,这项活动创先争优活动领导小组统一领导下进行,日常工作由人教牵头,创建“红盾服务创业示范岗”由注册牵头,;创建“红盾消费维权示范岗”由消保牵头,消协;创建“红盾品牌培育示范岗”由牵头创建“红盾强农惠农示范岗”由市牵头,注册,各分局要召开会议进行动员部署,并充分利用网络、简报等多种形式深入宣传发动,引导广大党员干部迅速投身到“党徽耀红盾”系列活动中来,充分发挥先锋模范作用,积极争创群众满意窗口服务单位。活动中涌现出来的先进人物和先进事迹,努力在全系统学习先进、崇尚先进、争当先进的良好氛围。各分局各要针对本单位、本条线的实际情况和工作特点,找准开展活动的切入点和着力点,科学设计、合理安排活动方式和载体,努力使各项措施切实可行、行之有效。为企业和群众办实事、解难题、做好事作为重点贯彻活动始终具有工商特色服务品牌开展业务培训、岗位练兵、技能竞赛活动,加强党性修养和作风建设,提高与结合起来,Bridge, service levels and even end on the intersection of rongzhou bridge f. 3.1—5 network saturation and intersection service level 3 the operation of the bridge over the River connecting downtown five bridges, bridge traffic flow at least, morning and evening peak bi—directional flow of 3358pcu/h and 3191pcu/h, respectively. Bridge traffic most of the minjiang River, morning rush hour two—way traffic to 4362pcu/h, the evening rush hour。

Bridge, service levels and even end on the intersection of rongzhou bridge f. 3.1—5 network saturation and intersection service level 3 the operation of the bridge over the River connecting downtown five bridges, bridge traffic flow at least, morning and evening peak bi—directional flow of 3358pcu/h and 3191pcu/h, respectively. Bridge traffic most of the minjiang River, morning rush hour two—way traffic to 4362pcu/h, the evening rush hour1。

— —Bridge, service levels and even end on the intersection of rongzhou bridge f. 3.1—5 network saturation and intersection service level 3 the operation of the bridge over the River connecting downtown five bridges, bridge traffic flow at least, morning and evening peak bi—directional flow of 3358pcu/h and 3191pcu/h, respectively. Bridge traffic most of the minjiang River, morning rush hour two—way traffic to 4362pcu/h, the evening rush hour。

2 次访问